Build the food service utility rough-in review record

Start with the equipment schedule, food service plans, architectural layouts, MEP plans, and equipment cuts when provided. Use the item tag to connect every rough-in to one location.

Compare the record with the estimate owner furnished item review. Keep this review tied to its own source documents and cost lines.

Check quantity and responsibility

Record connection type, size, elevation, load, shutoff, indirect waste, backing, curb, and furnished-by information shown. Keep final equipment data and code interpretation with the authorized project team.

AACE recommended practices offer general estimating references. Project documents and the approved estimate basis control the work.

Food Service Utility Rough-In Review control record
FieldRecord
LocationArea, system, and source
QuantityMeasured basis and unit
ResponsibilityIncluded work and package owner
StatusEstimate treatment and reviewer

Reconcile the estimate before release

Reconcile rough-ins with equipment furnished by owner or vendor, then assign final connections, startup, permits, and patching. Flag mismatches between consultant and MEP documents. Close open assignments through the mep scope interface matrix and retain the decision with the estimate revision.

Frequently asked questions

What starts a food service utility rough-in review?

Start with the controlling plans, schedules, details, and specifications. Define the full item population before extending cost.

How should an unclear condition be priced?

Record the current assumption, estimate treatment, responsible reviewer, and source needed for resolution.

What should stay with the estimate?

Keep the quantity record, source references, scope assignments, estimate revision, and approved disposition together.