Build the waterproofing transition takeoff review record
Mark transitions on plans, elevations, sections, and details. Give each condition a location, adjoining materials, termination, and drawing reference instead of relying on one perimeter allowance.
Compare the record with the building envelope takeoff review. Keep this review tied to its own source documents and cost lines.
Check quantity and responsibility
Measure membranes, flashings, primers, protection, sealants, terminations, and substrate preparation only where the selected detail requires them. Keep product selection with the approved project basis.
AACE recommended practices offer general estimating references. Project documents and the approved estimate basis control the work.
| Field | Record |
|---|---|
| Location | Area, system, and source |
| Quantity | Measured basis and unit |
| Responsibility | Included work and package owner |
| Status | Estimate treatment and reviewer |
Reconcile the estimate before release
Reconcile below grade, plaza, wall, roof, and opening interfaces with the packages on both sides. Record access and sequencing constraints with the measured condition. Close open assignments through the construction scope gap matrix and retain the decision with the estimate revision.