Build the sprayed fireproofing thickness takeoff review record
Use life safety plans, structural framing, schedules, details, and specifications to locate rated steel. Keep columns, beams, joists, deck, and connection conditions in separate quantity groups.
Compare the record with the structural steel quote leveling. Keep this review tied to its own source documents and cost lines.
Check quantity and responsibility
Record the stated material, thickness basis, surface preparation, masking, reinforcing, patching, and inspection scope. Route rating interpretation to the design team rather than filling gaps with an assumed thickness.
AACE recommended practices offer general estimating references. Project documents and the approved estimate basis control the work.
| Field | Record |
|---|---|
| Location | Area, system, and source |
| Quantity | Measured basis and unit |
| Responsibility | Included work and package owner |
| Status | Estimate treatment and reviewer |
Reconcile the estimate before release
Reconcile fireproofed members with ceilings, walls, MEP congestion, exterior exposure, and phased access. Carry return visits and repairs only when the estimate basis supports them. Close open assignments through the firestopping penetration takeoff review and retain the decision with the estimate revision.