Build the operable partition scope estimate review record

Use floor plans, reflected ceiling plans, sections, structural details, finish schedules, and the partition specification. Record opening width and height, panel type, stacking location, track layout, pass door, and operating method. Identify curves, intersections, and paired openings separately.

Use the interior partition takeoff review as a related control. Keep this review tied to its own source population and cost lines.

Check quantities and scope boundaries

List panels, track, carriers, seals, trim, pockets, closures, controls, and documented accessories. Keep structural support, backing, ceiling closures, floor preparation, electrical power, and finish work assigned to the package shown in the documents.

AACE recommended practices provide general estimating references. The controlled project documents and approved estimate basis govern this review.

Operable Partition Scope Estimate Review control record
Review fieldRequired record
PopulationLocation, type, and source
QuantityMeasured basis and unit
InterfaceIncluded work and package owner
DispositionEstimate treatment and reviewer

Reconcile the package before release

Reconcile the partition with structural framing, ceilings, lights, sprinklers, air devices, flooring, wall pockets, and egress openings. Confirm field measurement, engineering, installation, adjustment, and acoustic testing requirements before estimate release. Record unresolved assignments in the construction scope gap matrix and preserve the approved disposition with the estimate revision.

Frequently asked questions

What starts an operable partition scope estimate review?

Start with the controlling plans, schedules, details, and specifications. Define the complete item population before extending cost.

How should an unclear condition be estimated?

Record the current assumption, estimate treatment, responsible reviewer, and the source needed for resolution. Keep the question visible through review.

What should remain with the estimate?

Keep the quantity record, source references, scope assignments, estimate revision, and approved disposition together.

Interior TakeoffConstruction EstimatingCost Support