Build the lighting control device takeoff review record
Build the device list from lighting plans, control diagrams, schedules, sequences, and specifications. Link sensors, switches, relays, panels, gateways, and interfaces to the zone they control.
Compare the record with the electrical feeder takeoff review. Keep this review tied to its own source documents and cost lines.
Check quantity and responsibility
Record device type, location, wiring basis, enclosure, programming, and documented accessories. Do not invent a sequence where the drawings leave the controls design incomplete.
AACE recommended practices offer general estimating references. Project documents and the approved estimate basis control the work.
| Field | Record |
|---|---|
| Location | Area, system, and source |
| Quantity | Measured basis and unit |
| Responsibility | Included work and package owner |
| Status | Estimate treatment and reviewer |
Reconcile the estimate before release
Reconcile control devices with fixtures, branch circuits, emergency operation, daylight zones, HVAC interfaces, and system startup. Keep programming and functional testing assignments explicit. Close open assignments through the mep scope interface matrix and retain the decision with the estimate revision.