Build the laboratory casework utility interface review record

Build the room list from laboratory plans, casework elevations, schedules, MEP drawings, and equipment information. Tag each bench, cabinet, hood, sink, and service carrier to its room and drawing source.

Compare the record with the estimate owner furnished item review. Keep this review tied to its own source documents and cost lines.

Check quantity and responsibility

Record dimensions, material, finish, mounting, tops, sinks, fixtures, service fittings, and documented accessories. Separate casework supply from trade rough-ins and final connections.

AACE recommended practices offer general estimating references. Project documents and the approved estimate basis control the work.

Laboratory Casework Utility Interface Review control record
FieldRecord
LocationArea, system, and source
QuantityMeasured basis and unit
ResponsibilityIncluded work and package owner
StatusEstimate treatment and reviewer

Reconcile the estimate before release

Reconcile casework openings with plumbing, gases, electrical, controls, exhaust, walls, floors, and owner equipment. Keep field verification and final coordination responsibilities visible. Close open assignments through the construction scope matrix guide and retain the decision with the estimate revision.

Frequently asked questions

What starts a laboratory casework utility interface review?

Start with the controlling plans, schedules, details, and specifications. Define the full item population before extending cost.

How should an unclear condition be priced?

Record the current assumption, estimate treatment, responsible reviewer, and source needed for resolution.

What should stay with the estimate?

Keep the quantity record, source references, scope assignments, estimate revision, and approved disposition together.