Build the laboratory casework utility interface review record
Build the room list from laboratory plans, casework elevations, schedules, MEP drawings, and equipment information. Tag each bench, cabinet, hood, sink, and service carrier to its room and drawing source.
Compare the record with the estimate owner furnished item review. Keep this review tied to its own source documents and cost lines.
Check quantity and responsibility
Record dimensions, material, finish, mounting, tops, sinks, fixtures, service fittings, and documented accessories. Separate casework supply from trade rough-ins and final connections.
AACE recommended practices offer general estimating references. Project documents and the approved estimate basis control the work.
| Field | Record |
|---|---|
| Location | Area, system, and source |
| Quantity | Measured basis and unit |
| Responsibility | Included work and package owner |
| Status | Estimate treatment and reviewer |
Reconcile the estimate before release
Reconcile casework openings with plumbing, gases, electrical, controls, exhaust, walls, floors, and owner equipment. Keep field verification and final coordination responsibilities visible. Close open assignments through the construction scope matrix guide and retain the decision with the estimate revision.