Build the fire alarm device takeoff reconciliation record

Use fire alarm plans, risers, device legends, sequences, equipment schedules, and related MEP drawings. Count devices by type and floor, then record the initiating circuit, notification circuit, signaling path, or network connection shown. Keep design-build additions separate from documented counts.

Use the fire protection estimate review as a related control. Keep this review tied to its own source population and cost lines.

Check quantities and scope boundaries

Record backboxes, modules, isolators, relays, power supplies, batteries, annunciators, pathway, cabling, and identification where the estimate basis includes them. Do not infer circuit loading or product capacity when the design leaves those choices unresolved.

AACE recommended practices provide general estimating references. The controlled project documents and approved estimate basis govern this review.

Fire Alarm Device Takeoff Reconciliation control record
Review fieldRequired record
PopulationLocation, type, and source
QuantityMeasured basis and unit
InterfaceIncluded work and package owner
DispositionEstimate treatment and reviewer

Reconcile the package before release

Reconcile device counts with panels, risers, controlled equipment, smoke control, elevator interfaces, door releases, and sprinkler monitoring points. Preserve testing, programming, permits, and acceptance activities as named scope items with an assigned owner. Record unresolved assignments in the electrical feeder takeoff review and preserve the approved disposition with the estimate revision.

Frequently asked questions

What starts an fire alarm device takeoff reconciliation?

Start with the controlling plans, schedules, details, and specifications. Define the complete item population before extending cost.

How should an unclear condition be estimated?

Record the current assumption, estimate treatment, responsible reviewer, and the source needed for resolution. Keep the question visible through review.

What should remain with the estimate?

Keep the quantity record, source references, scope assignments, estimate revision, and approved disposition together.