Build the elevator scope estimate review record

Build a matrix for each elevator using plans, sections, schedules, details, and the current proposal. Record type, stops, openings, capacity, controls, cab finish basis, and stated exclusions.

Compare the record with the subcontractor quote scope leveling. Keep this review tied to its own source documents and cost lines.

Check quantity and responsibility

Assign hoistway structure, pits, embeds, rails, entrances, sills, machine spaces, ventilation, power, communications, fire alarm, and patching to the responsible package. AACE recommended practices offer general estimating references. Project documents and the approved estimate basis control the work.

Elevator Scope Estimate Review control record
FieldRecord
LocationArea, system, and source
QuantityMeasured basis and unit
ResponsibilityIncluded work and package owner
StatusEstimate treatment and reviewer

Reconcile the estimate before release

Reconcile alternates, allowances, permits, inspections, testing, protection, and temporary use. Keep proposal qualifications beside the estimate instead of burying them in a lump sum. Close open assignments through the construction scope gap matrix and retain the decision with the estimate revision.

Frequently asked questions

What starts a elevator scope estimate review?

Start with the controlling plans, schedules, details, and specifications. Define the full item population before extending cost.

How should an unclear condition be priced?

Record the current assumption, estimate treatment, responsible reviewer, and source needed for resolution.

What should stay with the estimate?

Keep the quantity record, source references, scope assignments, estimate revision, and approved disposition together.