Build the electrical grounding and bonding takeoff review record

Read one-line diagrams, grounding details, equipment schedules, plans, and specifications together. List service grounding, separately derived systems, building steel, water piping, concrete electrodes, ground rings, and equipment connections shown. Give every path a source reference.

Use the electrical feeder takeoff review as a related control. Keep this review tied to its own source population and cost lines.

Check quantities and scope boundaries

Measure conductors and count clamps, lugs, bars, bushings, jumpers, test wells, and connection points by the documented material and size. Keep lightning protection, telecommunications bonding, and utility work in separate scope groups.

AACE recommended practices provide general estimating references. The controlled project documents and approved estimate basis govern this review.

Electrical Grounding and Bonding Takeoff Review control record
Review fieldRequired record
PopulationLocation, type, and source
QuantityMeasured basis and unit
InterfaceIncluded work and package owner
DispositionEstimate treatment and reviewer

Reconcile the package before release

Reconcile grounding items with service equipment, transformers, generators, distribution gear, feeders, and site electrical work. Confirm excavation, concrete coordination, testing, labeling, and connection responsibility before the estimate moves to review. Record unresolved assignments in the construction scope gap matrix and preserve the approved disposition with the estimate revision.

Frequently asked questions

What starts an electrical grounding and bonding takeoff review?

Start with the controlling plans, schedules, details, and specifications. Define the complete item population before extending cost.

How should an unclear condition be estimated?

Record the current assumption, estimate treatment, responsible reviewer, and the source needed for resolution. Keep the question visible through review.

What should remain with the estimate?

Keep the quantity record, source references, scope assignments, estimate revision, and approved disposition together.