Build the branch circuit homerun takeoff reconciliation record
Trace homeruns from power and lighting plans to panel schedules and risers. Record the served load, circuit identifier, source panel, routing basis, and drawing reference for each group.
Compare the record with the electrical feeder takeoff review. Keep this review tied to its own source documents and cost lines.
Check quantity and responsibility
Separate normal, emergency, standby, and controlled circuits. Measure raceway and conductors from a stated path, and preserve unclear grouping or shared-neutral conditions as questions.
AACE recommended practices offer general estimating references. Project documents and the approved estimate basis control the work.
| Field | Record |
|---|---|
| Location | Area, system, and source |
| Quantity | Measured basis and unit |
| Responsibility | Included work and package owner |
| Status | Estimate treatment and reviewer |
Reconcile the estimate before release
Reconcile homeruns with device counts, panels, feeders, controls, ceilings, and rated penetrations. Confirm who carries supports, sleeves, firestopping, and final circuit identification. Close open assignments through the mep scope interface matrix and retain the decision with the estimate revision.